News
Articles
Case Histories
Buyer's Guide
Career Center
June 2008
May 2008
Arsenic
Bottled Water
Disinfection
Membrane Filtration
Click here for a subscription to
Water Quality Products
Give us your feedback on our site.
Change your subscription info
Subscribe to our
WQP/WWD Executive News Summary e-Newsletter.

News this week sponsored by: Invensys/Foxboro

INDUSTRY NEWS
 Share It
"../popup_app/index.cfm?fuseaction=showEmailPageToAFriendForm&appDirectory=wqp&linkQueryString=fuseaction=showNewsItem*amp*newsItemId=15519&linkLabel=BioteQ%20Commences%20Water%20Treatment%20%26%20Metal%20Recovery%20" target="_new">   "../popup_app/index.cfm?fuseaction=showEmailPageToAFriendForm&appDirectory=wqp&linkQueryString=fuseaction=showNewsItem*amp*newsItemId=15519&linkLabel=BioteQ%20Commences%20Water%20Treatment%20%26%20Metal%20Recovery%20" target="_new">Email this page to a friend
 
 More News
  • Australia’s Bundamba Treatment Plant Receives GWI's "Project of the Year" Award
  • NSF Certifies Vapor Control Balls
  • GE & Septech Partner to Provide Mobile Water Solutions to the United Arab Emirates & Oman
  • Clear Water Compliance Acquires KI Environmental
  • IUVA and WRc plc to Host Workshop on Cryptosporidium Control in Drinking Water
  • Membrana Liqui-Cel Membrane Contactors Selected for Largest Plasma Display Panel Plant in China
  • J.R. Wilson of Hanson Pressure Pipe Retires after 58 Years in the Industry
  • WateReuse Launches Australian Division
  • NSF Opens New Office in Thailand
  • First Singapore International Water Week a Success
  • GE MBR Technology to Help Restore Water Quality in China's Taihu Lake
  • SEDA Operator Challenge Scheduled for Membrane Week
  • Recent Press Conference Discussed Significance of Removing Mercury from Dental Wastewater
  • Hollywood Charity Event Raises Awareness, Funds for Global Water Foundation
  • Pentair & GE Water Join to Form Pentair Residential Filtration
  • CDM to Upgrade Guam's Wastewater Treatment System
  • Pentair and GE Water & Process Technologies May Form Joint Venture
  • EcoWater Selects Donnelly as Short Run Supplier
  • Asian Development Bank Outlines Water Agenda for Asia-Pacific Region
  • Komline-Sanderson Announces Redesigned Website
  • PWQA Member Joy Morley Passes Away
  • Godwin Pumps Active in Midwest Flood Relief
  • AwwaRF Board Allocates Funding for New Research
  • Water Associations, EPA Release Tools for Effective Utility Management Practices
  • Siemens Awarded $4 Million Grant to Develop New Seawater Desalination Technology
  • Beijing Utilizes Leak Noise Sensors to Monitor Pipelines to Olympic Venues
  • Michael I. Stefanic Joins Toray Sales Team
  • Encina Wastewater Authority Dedicates New Facilities
  • EPA Awards the Water Quality Standards Forum Cooperative Agreement
  • Canadian Waste & Recycling Expo Returns to Toronto in November
  • Siemens to Provide Wastewater Reuse System in Beijing, China
  • LPU-2428 Sensors from APG, Inc. Now CSA Certified for Hazardous Locations
  • Eimco Named U.S. Distributor of Atlantium Hydro-Optic Disinfection System
  • Dynisco Restructures Company, Forms New Market Segments
  • AWWA Announces Project to Address Water Workforce Challenges
  • River Restoration Committee Elects New Chair
  • San Diego WateReuse Association Awards Prizes to Area Students
  • University of California Students Tour Upgraded Vallecitos Water District Facility
  • Dow Technology Selected for Desalination Plant in Cyprus
  • Mississippi River Floods Move South
  • Association of Metropolitan Water Agencies Asks Congress to Maintain Local Water Treatment Choice
  • WWEMA & WWD Now Accepting 2008 Scholarship Applications
  • Fluid Imaging Technologies Introduces New Cyanobacteria Detection System
  • Dare County, N.C., to Install Elster AMCO Water’s evolutionTM AMI
  • Skanska Awarded $45 Million Plant Contract in California
  • Action Plan to Reduce Nutrients to Mississippi River Released
  • Insituform Awarded $3 Million in Water Line Rehabilitation Projects
  • Basin Water to Offer NSF 61-Certified Photocatalytic Membrane Systems to Drinking Water Facilities
  • Eight Pipeline Seminars Scheduled Across the U.S.
  • Aquatech Awarded Water Treatment Contract in Hawaii
  • Dow Technology Selected for Sydney Seawater Desalination Project
  • Mike Leonard Assumes Presidency of American Water Works Association
  • EPA Expedites Approval of Alternative Test Procedures for Contaminants
  • Procorp Introduces New Pellet Reactor System
  • Toray to Supply Reverse Osmosis Membrane for a Large-Scale Wastewater Plant in Singapore
  • American Water Canada Receives Award From American Public Works Association
  • Wonderware Unveils IndustryPack for Water & Wastewater Applications
  • WIKA Instruments Selects Selltis Sales 5.0 Software
  • National Water Quality Monitoring Conference 2008 a Success
  • Poseidon Resources Names Scott Maloni Vice President
  • Press Conference will Discuss Importance of Removing Amalgam from Dental Wastewater
  • Louisville, Ky., Water Company Wins Water Taste Test at ACE08
  • EPA Reaffirms Clean Water Permits Not Needed for Water Transfers
  • Wilo EMU Pumps Now Made in U.S.
  • Water Leaders Launch Water Policy Institute to Address Challenges
  • ADS to Demonstrate Large Diameter Leak Detection Services at ACE08
  • Aquionics Showing Drinking Water Validated UV System At ACE08
  • Fluid Conservation Systems, Datamatic Announce Partnership
  • Water Dealer Ned Jones Inducted into WQA Hall of Fame
  • WQA Aquatech 2008 Wraps Up
  • Kinetico Launches Expandable Treatment System at Aquatech
  • WQA Identifies Major Issues for 2008
  • WQA Awards Water Quality Industry Advocates
  • Flowban Takes Delivery of First Production Units
  • BASF to Feature Water Treatment Solutions
  • Sales Presentation to be Held at WQA Aquatech
  • Severn Trent Services Awarded Contract for Desalination Plant in Mexico
  • Fairbanks Morse Announces Contract for New York City
  • NNGWA Conference Examines Pharmaceuticals and Endocrine Disrupting Chemicals in Water
  • AwwaRF Announces Report on Endocrine Disrupting Compounds in Drinking Water
  • Elster AMCO Water Appoints New President
  • NSF Announces New Certification Program for Geothermal Piping Applications
  • NSF Announces New Certification Program for Geothermal Piping Applications
  • Cruise Ships Reach Agreement With Washington DOE
  • World Bank Supports Improving Water Supply in Tajikistan
  • Water Service Company Blamed in Ireland Death
  • U.S. Navy Ordered to Reduce Drinking Water Chemical Levels
  • CH2M HILL Names Team Leader and Technology Director

  • All Current News
  • Archived News
  • BioteQ Commences Water Treatment & Metal Recovery

    Operations began at two new plants at mine sites in Australia and China
    March 14, 2008

    BioteQ Environmental Technologies, Inc., a leader in the treatment of metal- and sulphate-contaminated water, announced that metal recovery has commenced at two new water treatment plants located at mine sites in Australia and China, and that both plants are gradually ramping up production to full capacity. BioteQ expects both projects to provide a three-year payback on capital, with the plants contributing to revenues by the second quarter of 2008.


    China – The Dexing Plant
    The total capital cost to date of the Dexing plant in China has been $3.6 million, compared to the original budget of $4.2 million. The plant is designed to treat acidic mine drainage to recover copper using BioteQ’s proprietary ChemSulphide process, and to produce a saleable metal product and clean water that can be discharged to the environment. The project is a joint venture with Jiangxi Copper Co. Ltd., China’s largest copper producer. The project partners share equally in the capital and operating costs, as well as the metals recovered.

    Brad Marchant, CEO of BioteQ, said, “The project has gone very well, due to a dedicated BioteQ staff in China and excellent cooperation and support from our joint venture partner, who have provided local knowledge and experienced staff throughout the construction and commissioning phase. We look forward to working with them on future projects that can use BioteQ’s technology.”

    The commissioning process where the plant components are tested and optimized has taken about four months. There have been some delays in the commissioning process due to severe winter weather. The plant is now processing metal-laden wastewater from several sources at the Dexing mine site, and will be fully commissioned by the second quarter of 2008. The minimum capacity of the plant is anticipated to be 1 million lb of copper per year, and the maximum capacity is 4.4 million lb per year, depending on the copper grade and volume of acidic water treated. The high-grade copper product produced at the Dexing plant will be refined at the Jiangxi Copper refinery at commercially competitive rates. Annual operating costs for the plant are budgeted at $1.6 million for 2008 with expected total copper production of 1.1 million lb.

    The Dexing copper mine, located near Dexing City in Jiangxi Province in southeastern China, currently produces 120,000 metric tonnes of copper concentrate per year from flotation concentrate and also operates a heap leach using SX-EW to produce copper cathode from low-grade stockpiles. Daily production at the mine is 100,000 metric tonnes of ore and the current resource provides 50 years of operation at current production rates.


    Australia – The Mt. Gordon Project
    In September, BioteQ initiated commissioning of its new plant in Australia at the Mt. Gordon mine owned by Aditya Birla. This is a build-own-operate project. The plant is designed to recover copper in a pure copper product as well as cobalt and nickel in a combined product using BioteQ’s proprietary ChemSulphide process to produce saleable metals and clean water. Following metal recovery, the water is further treated by standard evaporation methods to maintain the mine site’s water balance.

    Commissioning was delayed by scarce construction labor in Australia to complete critical plant components on schedule. The evaporation and copper circuits are now operational and the cobalt-nickel circuit is expected to be operational early in the second quarter. The plant will be considered fully commissioned when it operates at 75% of capacity for 14 days. The original capital cost estimate by BioteQ of $4.3 million has doubled to $8.5 million, primarily due to the rapidly increasing cost of labor in Australia, extensive site refurbishment that was not originally anticipated and the incremental capital cost of the evaporation circuit. BioteQ agreed to install an evaporation system in return for increasing their share of net revenues from the sale of metals recovered from 50 to 90%.

    The plant is expected to meet BioteQ’s three-year payback criteria. BioteQ has provided the capital cost of the plant and is responsible for all operating costs in exchange for 90% of net revenues from the sale of metals recovered.

    The treatment plant has a design capacity of 2.2 billion liters of water per year, and BioteQ expects the plant to process 1.44 million lb of copper, 135,000 lb of cobalt and 23,000 lb of nickel annually. Annual operating costs are anticipated to be $4.3 million.



    Source: BioteQ Environmental Technologies, Inc.   March 14, 2008


    Home   |   Advertising   |   News Search   |   Articles   |   Buyer's Guide   |   Career Center   |   Case Histories   |   Top of Page