 Related Articles
"How Grease-Lubricated Bearings Function"

"Water Intake At New Illinois Power Plant Designed for Variable Flows"

 Editorial Categories
  • C&I - Commercial & Industrial
  • Coatings
  • Industrial
  • Infrastructure Security
  • Infrastructure Security
  • Pumping
  • Pumps
  • Water
  • Water
  • Water/Wastewater

     Alternate Format
    View article as a PDF
     Share It
    "/popup_app/index.cfm?fuseaction=showEmailPageToAFriendForm&appDirectory=wqp&linkQueryString=fuseaction=showArticle*amp*articleID=2462&linkLabel=Coatings Repair 20-year-old Pump, Save Replacement Costs" target="_new">   "/popup_app/index.cfm?fuseaction=showEmailPageToAFriendForm&appDirectory=wqp&linkQueryString=fuseaction=showArticle*amp*articleID=2462&linkLabel=Coatings Repair 20-year-old Pump, Save Replacement Costs" target="_new">Email this Article to a Friend

    Coatings Repair 20-year-old Pump, Save Replacement Costs

       Terms & Conditions of Use


    When one of four circulating water pumps at the Potomac Electric Power Company (PEPCO) Chalk Point Generating Station began to leak, engineers began to worry.

    The Potomac Electric Power Company (PEPCO) Chalk Point Generating power plant is Maryland’s largest, serving Washington, D.C., and suburbs.

    The specially designed 20-year-old pump, which handles 127,500 gallons of cooling water per minute, showed cracks in its casing and pitting from corrosion. The estimated replacement cost was over $1 million.

    In their search for a cost-effective way to repair the pump, PEPCO contacted Devcon of Danvers, Mass., which recommended a repair solution that took less than two weeks and saved PEPCO hundreds of thousands of dollars.

    First, PEPCO employees sand blasted, solvent washed, and coated the pump with Devcon FL-10 Primer. They then filled cracks, pits, and holes with Titanium Putty, a titanium-reinforced epoxy compound with high compressive strength (to 18,800 psi), high temperature resistance (to 350° F), and optimal resistance to chemical and acid corrosion.

    Finally, they applied Devcon Brushable Ceramic – a brushable, two-coat, corrosion-resistant epoxy coating – which produces a smooth, long-lasting, protective surface. Repairing the pump instead of replacing it saved Potomac Electric Power Company over $900,000.

    All work was performed by PEPCO maintenance personnel. The Devcon regional manager was on site during the repairs to provide technical/application assistance. The pump was back in service in less than two weeks

    PHOTO CAPTION: Used to repair a worn and leaking cooling-water pump, Devcon products helped it to be returned to service in less than two weeks. After sand blasting, washing, and priming the huge pump’s inner walls, workers filled cracks, pits, and holes with Devcon Titanium Putty. For long-term protection, internal surfaces were then coated with Devcon Brushable Ceramic to produce a smooth surface that resists corrosion and abrasion.

    For additional information, contact Devcon at 800-933-8266 or write in on this issue’s Reader Service Card.